Loading...

Period

November 2019 – March 2020

Location

Upper Nile Estate

 

Description

Field investigation and preliminary design of upgrading to bitumen standards of Paloich-Pagak road from junction with Melut road (FPF Palochi) in oil Field to Pagak Payam in Ethiopian border. The total length was 264Km and 70Km of the stretch is paved and the rest to gravel standards.

 

Services Offered

Traffic Study.

Hydrological Study.

Geometric design of the alignment.

Pavement design.

Preparation of technical specifications.

Preparation of engineering report.