Field investigation and preliminary design of upgrading to bitumen standards of Paloich-Pagak road from junction with Melut road (FPF Palochi) in oil Field to Pagak Payam in Ethiopian border. The total length was 264Km and 70Km of the stretch is paved and the rest to gravel standards.